TY - CONF A1 - Neumann, Martin A1 - Quercetti, Thomas A1 - Wille, Frank A1 - Gröke, Carsten A1 - Neumeyer, Tino T1 - Design assessment, approval of management systems and ageing aspects of transport packages for radioactive material not requiring competent authority approval of design N2 - Most transports of radioactive materials are carried out with packages not requiring competent authority approval of design. These encompass – in accordance with the IAEA SSR-6 [1] regulations – packages of the classification excepted, Industrial packages Type 1, 2 and 3 and Type A packages. Currently an upsurge in number and variation of these package designs can be seen in Germany, resulting from the phase out of nuclear energy in Germany as well as e. g. increased use of radioactive material for medical purposes. A design assessment regarding the package safety is required in the international IAEA SSR-6 [1] regulations. BAM operates facilities for the performance of all regulatory tests required such as drop towers for a wide range of package masses and dimensions, fire test, leak tightness measurements and pressure test facilities. Experiences with several package types are shown. Additionally, IAEA SSR-6 [1] requires the establishment of a management system for design, manufacture, maintenance, and repair of the packaging as well as for the preparation, consigning, loading, carriage, unloading and receipt of the package. Relevant for Germany, BAM has published guidance material on the process of management system acceptance in the technical guide BAM-GGR 016 [2]. The requirements encompass quality management plans for the manufacturing of packages including independent manufacturing surveillance and specific instructions for operation, maintenance, and repair of packagings. Examples for management system specifics and requirements are given. Since the latest edition of the IAEA SSR-6 [1] regulations an ageing evaluation including systematic ageing management measures are required for all kind of package types. BAM is going to update the guidance material BAM-GGR 016 [2] to support the stakeholders with relevant information to fulfil the ageing aspect for packages not requiring competent authority approval. The paper explains how the ageing aspect may be included in the safety evaluation process and the management system measures and will give an outlook for the future guidance material. T2 - 20th International Symposium on the Packaging and Transportation of Radioactive Materials (PATRAM 22) CY - Juan-les-Pins, France DA - 11.06.2023 KW - Radioactive material KW - Type A package KW - Management system KW - Tests KW - Non-approved PY - 2023 AN - OPUS4-57704 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Schilling, O. A1 - Neumann, Martin A1 - Wolff, Dietmar A1 - Wille, Frank A1 - Darnstädt, A. T1 - System of Quality Assurance Measures in Manufacturing and Operation of Dual Purpose Casks for Spent Nuclear Fuel and High Level Waste in Germany N2 - German spent nuclear fuel and high level waste is stored in dry conditions in interim storage facilities until a final repository will be ready for operation in the future. Dual purpose casks are used for the packaging of the materials to ensure transportability at any time during long-term interim storage and fulfilling both requirements from interim storage as well as transport. Germany’s 2011 decision to phase out utilization of nuclear energy has led to a high demand for casks for decommissioning power plants as quickly as possible. Cask serial production will continue at a high level for the next few years. In the process, a system of quality assurance measures ensures that every cask reliably complies with design specification according the transport approval certificate and storage license. When the first casks were manufactured in Germany about 40 years ago, quality assurance was oriented towards pressure vessel and general nuclear manufacturing. The system was continuously adapted to the state of the art. In particular serial production, globalization of manufacturing and deep supplier chains had to be taken into account. The system of quality assurance measures applied today for cask manufacturing shall be presented here. The quality assurance measures can be categorized as system-related and design-related. With respect to transport regulations for example, they are independently approved and monitored by the competent authority BAM and its authorized inspection experts. The qualification of the applicant is reviewed first in the context of the design approval procedure and then periodically. The qualification of component and cask manufacturers is also checked at the start of manufacturing and then periodically. Before the start of manufacturing documents such as quality plans are pre-assessed. Manufacturing and inspection are then performed according to the pre-assessed documents. Cask manufacturing is completed by a final inspection before commissioning. Periodic inspections during operation ensure preservation of the properties specified in the approval certificate over package life time. The type and the time interval of periodic inspections depend on the use of the package. For transport after interim storage a system of specific tests and inspections is prescribed. T2 - 20th International Symposium on the Packaging and Transportation of Radioactive Materials (PATRAM 22) CY - Juan-les-Pins, France DA - 11.06.2023 KW - Radioactive material KW - Quality Assurance Measures KW - Dual Purpose Casks KW - Independent Surveillance PY - 2023 AN - OPUS4-57705 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Neumann, Martin A1 - Gleim, Tobias A1 - Gradt, Thomas A1 - Wille, Frank T1 - Friction coefficients for wood-wood and wood-steel interfaces in impact limiters for transport casks T2 - Proceedings of the 20th International Symposium on the Packaging and Transportation of Radioactive Materials N2 - Wood is widely used in impact limiters of transport casks for radioactive material. Encapsulated by an outer and inner steel structure, spruce wood is often applied in layers of alternating direction. The friction at the interfaces between these layers is of crucial importance for the impact and energy absorption e.g., at an accidental impact of a cask against a hard target. In order to get detailed information for corresponding numerical calculations, in this study the friction coefficient for the combinations wood-wood and wood-steel was measured in the temperature range between -40°C and 90°C according to the relevant stress conditions for such casks. Results show decreasing friction with increasing temperature, ranging from 0.43 at -40°C to 0.22 for 90°C for wood-steel combinations and from 0.3 at -40°C to 0.24 at 90°C to for a wood-wood combination. T2 - 20th International Symposium on the Packaging and Transportation of Radioactive Materials CY - Juan-les-Pins, France DA - 11.06.2023 KW - Wood KW - Friction KW - Transport cask PY - 2023 SP - 1 EP - 11 AN - OPUS4-57334 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - JOUR A1 - Neumann, Martin A1 - Gleim, Tobias A1 - Gradt, Thomas T1 - Friction coefficients for wood-wood and wood-steel high pressure contact under temperatures between -40 °C and 90 °C JF - Tribologie + Schmierungstechnik N2 - Wood is widely used in impact limiters of Transport casks for radioactive material. Encapsulated by an outer and inner Steel structure, spruce wood is offen applied in layers of altemating direction. The friction at the interfaces between these layers is of crucial importance for the impact and energy absorption e.g., at an accidental impact of a cask against a hard component. In order to get detailed Information for corresponding numerical calculations, in this study the friction coefficient for the combinations wood-wood and wood-steel was measured in the temperature ränge between -40 °C and 90 °C according to the relevant stress conditions for such casks. Results show decreasing friction with increasing temperature, ranging from 0.43 at -40 °C to 0.22 for 90 °C for wood-steel combinations and from 0.3 at -40 °C to 0.24 at 90 °C to for a wood-wood combination. KW - Wood KW - Friction KW - Transport cask KW - Radioactive material PY - 2023 DO - https://doi.org/10.24053/TuS-2023-0007 SN - 0724-3472 VL - 70 IS - 2 SP - 5 EP - 12 PB - expert verlag AN - OPUS4-57787 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Neumann, Martin A1 - Gleim, Tobias A1 - Gradt, Thomas T1 - Friction coefficients for wood-wood and wood-steel contacts N2 - The friction at the interfaces between pieces of wood and steel is of crucial importance for the impact and energy absorption in impact limiters of transport casks for radioactive material. Here, the friction coefficient for the combinations wood-wood and wood-steel was measured in the temperature range between -40°C and 90°C. Results show decreasing friction with increasing temperature, ranging from 0.43 at -40°C to 0.22 for 90°C for wood-steel combinations and from 0.3 at -40°C to 0.24 at 90°C for a wood-wood combination. T2 - Sandia-BAM Workshop CY - Berlin, Germany DA - 21.11.2022 KW - Wood KW - Friction KW - Transport cask PY - 2022 AN - OPUS4-56342 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Gleim, Tobias A1 - Neumann, Martin A1 - Linnemann, Konrad A1 - Komann, Steffen A1 - Wille, Frank T1 - Fracture Mechanical Analyses of a Welding Seam of a Thick-Walled Transport Package T2 - Proceedings of the ASME 2022 Pressure Vessels & Piping Conference N2 - Transport packages shall satisfy various safety criteria regarding mechanical, thermal and radiation phenomena. Typical requirements focusing mechanical aspects are usually drop tests in accordance with IAEA regulations. The drop tests are usually carried out experimentally and, as an additional measure, finite element analyses (FEA) are performed. A specific part of the investigations presented is the evaluation of the welding seam connecting cask shell and cask bottom. Experimental results and FEA are presented and compared. The evaluation of the welding seam performed includes a variety of aspects. In addition to the experimental and analytical stresses determined, different standards are used to investigate a possible crack initiation. Several destructive and non-destructive tests are performed for quality assurance in the manufacturing process as well as for different input parameters. The necessary monitoring and non-destructive measurement methods to define the boundary conditions of the standards are introduced. Taking into account all required parameters, the welding seam is examined and evaluated using the failure assessment diagrams (FAD) of the respective standards. It can be shown under the given boundary conditions that considering the experimental data, the welding seam is in the context of crack initiation below the enveloping curve in the acceptable region. More critical drop tests to be conducted are proposed and need to be investigated in future work. T2 - Pressure Vessels & Piping Conference® 2022 CY - Las Vegas, NV, USA DA - 17.07.2022 KW - Transport package KW - Drop test KW - Fracture initiation PY - 2022 SP - 1 EP - 9 AN - OPUS4-55375 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Schubert, Sven A1 - Reichardt, Adrian A1 - Wille, Frank A1 - Komann, Steffen A1 - Neumann, Martin T1 - Introduction of an ageing management approach for packages for the transport of radioactive materials T2 - Proceedings of the INMM & ESARDA Joint Annual Meeting N2 - With integration of the new para 613A into SSR-6 [1] the consideration of ageing mechanisms is now obligatory for the design of packages and their approval. In addition, para 809(f) of SSR-6 [1] requires consideration of the effects of storage on ageing mechanisms, safety analyses and operation and maintenance instructions. German competent authorities Bundesanstalt für Materialforschung und -prüfung (BAM) and Bundesamt für die Sicherheit der nuklearen Entsorgung (BASE) are considering the aspect of ageing in approval procedures. Ageing assessment is mainly focused on dual purpose casks (DPC) package designs which are long-term stored in interim storage facilities. For these package designs, the evaluation of ageing management is now mandatory for the maintenance of the package design approvals with a validity period of 5 years and beyond. The ageing management includes amongst others a gap analysis, the assessment of ageing effects and operational experiences during operation and interim storage. BAM works on the compilation of a guideline for implementation of paras 613A, 809(f) and 809(k) for packages requiring competent authority approval at the application procedure in Germany. The paper describes essential items of ageing mechanisms and will give a foresight to the ageing management evaluation by BAM. T2 - INMM & ESARDA Joint Annual Meeting CY - Online meeting DA - 30.08.2021 KW - Dual purpose casks KW - Ageing KW - SSR-6 KW - Interim storage KW - Ageing mechanisms KW - Transport of radaioactive materials PY - 2021 UR - https://www.abstractsonline.com/pp8/#!/10383/presentation/964 SP - 1 EP - 6 PB - Institute of Nuclear Materials Management (INMM) CY - Mount Laurel, NJ AN - OPUS4-53180 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Quercetti, Thomas A1 - Wille, Frank A1 - Neumann, Martin A1 - Linnemann, Konrad ED - Baraldi, P. ED - Di Maio, F. ED - Zio, E. T1 - Safety Evaluation of a Package for Radioactive Waste by Full-Scale Drop Testing T2 - Proceedings of the 30th European Safety and Reliability Conference and 15th Probabilistic Safety Assessment and Management Conference (ESREL2020 PSAM15) N2 - As part of the evaluation of a package for the safe transport of radioactive waste the regulations of the IAEA International Atomic Energy Agency shall be fulfilled. The regulations define requirements for the package and specify mechanical and thermal test conditions. Different methods are allowed for the test performance to demonstrate compliance with the regulations. Next to calculational approaches and the use of models of an appropriate scale, the performance of full-scale testing with prototype packages respectively full-scale models is applied. The use of full-scale models has several advantages within the complete safety assessment procedure for a transport package approval. Scaling and corresponding similarity questions don’t have to be considered, additional material investigations can be limited and analyses to transfer test results to the original package design are reduced in number and complexity. Additionally, experience for future serial design procedures can be built up during manufacturing and assembling of the test model. BAM operates different drop and fire test facilities south of Berlin, Germany. BAM has started to perform a drop test campaign with a full-scale model of 120 metric tons weight for a transport package approval procedure. The paper describes experience with test preparation, drop performance and additional analyses. The measurement concept is explained and test goals regarding the package safety assessment and evaluation of safety margins are introduced. T2 - 30th European Safety and Reliability Conference and 15th Probabilistic Safety Assessment and Management Conference (ESREL2020 PSAM15) CY - Online meeting DA - 01.11.2020 KW - Slap-down KW - Transport safety KW - Package KW - Drop test KW - Similarity KW - FEA KW - Radioactive waste PY - 2020 UR - https://www.rpsonline.com.sg/proceedings/esrel2020/html/3809.xml SN - 987-981-14-8593-0 SP - Paper 3809,1 EP - 8 PB - Research Publishing Services CY - Singapore AN - OPUS4-50981 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Neumann, Martin A1 - Wille, Frank A1 - Kuschke, Christian A1 - Schubert, Sven A1 - Schilling, Olaf A1 - Günther, Uve A1 - Darnstädt, Andreas T1 - Requirements for management systems for manufacturing of transport packages: the new revision of BAM-GGR 011 guideline N2 - In accordance with IAEA SSR-6 para 306 a management system shall be established and implemented to ensure compliance with the relevant provisions of the IAEA regulations. BAM has issued an update of the guideline: the BAM-GGR 011. The new revision describes necessary quality assurance measures for design, manufacture, testing, documentation, use, maintenance and inspection of packagings for package designs requiring competent authority approval for the transport of radioactive material. The measures can be categorised as system-related and design-related. They are independently approved and monitored by the German competent authority BAM and its authorised expert (BAM/T). The qualification of the organisation applying for the design approval certificate is reviewed in the context of the design approval procedure. The quality assurance measures for manufacture consist of three main steps. Pre-assessment of manufacturing documents such as quality plans, specifications etc., Manufacturing inspections according the pre-assessed documents and inspection before commissioning including documentation review. Periodic inspections during operation as well as relevant specifications for use and maintenance ensure that the properties specified in the approval certificate are preserved over the package life time. Special provisions for the return on experience regarding operational feedback for design, manufacture, use, maintenance and inspection are given. Special focus shall be given here to the rearranged and meanwhile established system of manufacturing inspections. This includes more transparent roles for a) the producers authorised inspection 11282 representative, b) the independent inspection expert (S), acting on behalf of the manufacturer with acceptance of BAM, and c) BAM or its authorised expert (BAM/T). Additional attention shall be drawn to the management of deviations during manufacturing and provisions for maintenance and periodic inspections. T2 - 19th International Symposium on the Packaging and Transportation of Radioactive Materials PATRAM 2019 CY - New Orleans, LA, USA DA - 04.08.2019 KW - Quality assurance KW - Transport KW - Manufacturing KW - Surveillance KW - Radioactive material PY - 2019 AN - OPUS4-49056 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Neumann, Martin A1 - Schilling, O. A1 - Kuschke, Christian A1 - Darnstädt, A. A1 - Schubert, Sven A1 - Günther, U. A1 - Wille, Frank T1 - Requirements for management systems for manufacturing of transport packages: the new revision of BAM-GGR 011 guideline T2 - Proceedings of the 19th International Symposium on the Packaging and Transportation of Radioactive Materials PATRAM 2019 N2 - In accordance with IAEA SSR-6 para 306 a management system shall be established and implemented to ensure compliance with the relevant provisions of the IAEA regulations. BAM has issued an update of the guideline: the BAM-GGR 011. The new revision describes necessary quality assurance measures for design, manufacture, testing, documentation, use, maintenance and inspection of packagings for package designs requiring competent authority approval for the transport of radioactive material. The measures can be categorised as system-related and design-related. They are independently approved and monitored by the German competent authority BAM and its authorised expert (BAM/T). The qualification of the organisation applying for the design approval certificate is reviewed in the context of the design approval procedure. The quality assurance measures for manufacture consist of three main steps. Pre-assessment of manufacturing documents such as quality plans, specifications etc., Manufacturing inspections according the pre-assessed documents and inspection before commissioning including documentation review. Periodic inspections during operation as well as relevant specifications for use and maintenance ensure that the properties specified in the approval certificate are preserved over the package life time. Special provisions for the return on experience regarding operational feedback for design, manufacture, use, maintenance and inspection are given. Special focus shall be given here to the rearranged and meanwhile established system of manufacturing inspections. This includes more transparent roles for a) the Producers authorised inspection 11282 representative, b) the independent inspection expert (S), acting on behalf of the manufacturer with acceptance of BAM, and c) BAM or its authorised expert (BAM/T). Additional attention shall be drawn to the management of deviations during manufacturing and provisions for maintenance and periodic inspections. T2 - 19th International Symposium on the Packaging and Transportation of Radioactive Materials PATRAM 2019 CY - New Orleans, LA, USA DA - 04.08.2019 KW - Quality assurance KW - Transport KW - Manufacturing KW - Surveillance KW - Radioactive material PY - 2019 SP - Paper 1128, 1 AN - OPUS4-49059 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER -