TY - CONF A1 - Auersch, Lutz A1 - Said, Samir A1 - Zhu, Shaocheng T1 - Dynamic testing of track damage before and after construction, after damage and after repair N2 - The Federal Institute of Material Research and Testing (BAM) has collected some experience with the testing of damaged, repaired and newly constructed railway tracks. The experimental methods are hammer testing of the track at different positions, hammer testing of the soil, measurement of train passages, and in all cases, measurements with geophones at different positions. The measured signals are evaluated for wave velocities (dispersion of the soil or the track-soil system), for transfer functions (transfer admittances of the soil, compliances of the track in amplitude and phase), and one-third octave band spectra of the track response to hammer and train excitation. These methods are applied at different stages of the track construction. Before track construction, wave velocities and transfer functions of the sub-soil can indicate problems with soft soils. After track construction, a check of the acceptable state of the track can be done by comparison of many excitation positions and track sites. After a track damage (a lose sleeper or a lose plate of a slab track) and after its repair, the sensitivity of the different measurement quantities to different track errors and the achieved improvement of the repair can be determined. The contribution shows examples of all these track situations T2 - Int. Conf. on Rail Transportation CY - Chengdu, China DA - 10.07.2017 KW - Track damage KW - Dynamic testing KW - Hammer tests KW - Train passages PY - 2017 AN - OPUS4-42490 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Auersch, Lutz A1 - Said, Samir T1 - Dynamic testing of tracks and track sites before and after construction, after damage and after repair T2 - Proceedings of the first International Conference on Rail Transportation N2 - The Federal Institute of Material Research and Testing (BAM) has collected some experience with the testing of damaged, repaired and newly constructed railway tracks. The experimental methods are hammer testing of the track at different positions, hammer testing of the soil, measurement of train passages, and in all cases, measurements with geophones at different positions. The measured signals are evaluated for wave velocities (dispersion of the soil or the track-soil system), for transfer functions (transfer admittances of the soil, compliances of the track in amplitude and phase), and one-third octave band spectra of the track response to hammer and train excitation. These methods are applied at different stages of the track construction. Before track construction, wave velocities and transfer functions of the sub-soil can indicate problems with soft soils. After track construction, a check of the acceptable state of the track can be done by comparison of many excitation positions and track sites. After a track damage (a lose sleeper or a lose plate of a slab track) and after its repair, the sensitivity of the different measurement quantities to different track errors and the achieved improvement of the repair can be determined. The contribution shows examples of all these track situations. T2 - First International Conference on Rail Transportation CY - Chengdu, China DA - 10.7.2017 KW - Track damage KW - Dynamic testing KW - Hammer tests KW - Train passages PY - 2017 SP - 1 EP - 9 PB - Southwest Jiaotong University CY - Chengdu, China AN - OPUS4-42090 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Auersch, Lutz T1 - Comparative measurements and calculations of ground vibrations near slab and ballast tracks N2 - Measurements of ground and track vibrations have been performed at a high-speed line in northern Germany. Impacts on the track and the ground, and passages of different trains with different speeds on different tracks have been measured. Transfer functions of the soil are presented and approximated by theoretical soil models. By using these transfer functions, the measured ground vibration between 2 to 64 m distance from the track can be transformed into a load spectrum which can be used for predictions at other sites. The method is compared to the soil-dependent method of an emission spectrum at a certain distance (8 m for example). The influence of train type, speed and track type is discussed on the base of the different emission quantities and the original measurements. The strong influence of the track, ballast track and slab track, is analysed by a theoretical model in wavenumber domain. The response of the track to the passage of the static load is reduced by the stiffness of the slab, the deformation of the track as well as the impulse acting on the soil. Usually, the impulse on the soil should result in a slow quasi-static movement of the soil, slower at further distances. In a heterogeneous soil, however, the impulses from the static loads scatter and keep parts of the higher impulse frequency band. In this case the reduced impulse spectra of the slab track will yield reduced ground vibration in a certain frequency band. Additional (BAM and international) measurements will be used to discuss this and possible other explanations for the different ground vibration differences. T2 - Railways 2018 CY - Sitges, Spain DA - 03.09.2018 KW - Ground vibration measurements KW - Train passages KW - Tran speed KW - Train configuration KW - Ballast track KW - Slab track PY - 2018 AN - OPUS4-46401 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER -