TY - CONF A1 - Said, Samir A1 - Auersch, Lutz T1 - Measurement of slab track behaviour at different sites N2 - Measured train passages and hammer impacts in combination with track-soil calculation have been successfully used for the detection of damaged slab tracks. This approach is now extended to intact slab and ballast tracks. The vibrations of many tracks have been measured at several levels from rail, sleeper, track plate, base plate, base layer to the subsoil by velocity or acceleration sensors. The time histories have to be integrated once or twice to get the displacements. The displacement signals include an arbitrary time-dependent shift which must be eliminated or respected in the interpretation. On the other hand, the calculation of slab and ballast tracks have been done in frequency-wavenumber domain. The displacements along the track and the frequency-dependent compliance transfer functions can be calculated. The latter can be compared with the results of the hammer impacts on the track. The deformation of the track can be transformed to time histories for a whole train and compared to the measured train passages. Many slab (and ballast) tracks have been measured at different sites. The displacements of the tracks are presented, and the following parameters have been analysed in the measurement results: slab track vs. ballast track, different types of slab tracks, damaged slab tracks, different trains, switches at different measuring points, an elastic layer, the mortar layer, different soils at different places. The soil should have the dominant influence on the track-plate displacements. Slab and ballast track yield also big differences in maximum displacement and width of deformation. Some of the preceding aspects will be analysed in comparison of measurement and theory. T2 - 26th International Congress on Sound and Vibration (ICSV26) CY - Montreal, Canada DA - 07.07.2019 KW - Displacements KW - Train passage KW - Slab track KW - Hammer impact KW - Vibration measurements PY - 2019 AN - OPUS4-48495 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER - TY - CONF A1 - Auersch, Lutz A1 - Said, Samir A1 - Zhu, Shaocheng T1 - Dynamic testing of track damage before and after construction, after damage and after repair N2 - The Federal Institute of Material Research and Testing (BAM) has collected some experience with the testing of damaged, repaired and newly constructed railway tracks. The experimental methods are hammer testing of the track at different positions, hammer testing of the soil, measurement of train passages, and in all cases, measurements with geophones at different positions. The measured signals are evaluated for wave velocities (dispersion of the soil or the track-soil system), for transfer functions (transfer admittances of the soil, compliances of the track in amplitude and phase), and one-third octave band spectra of the track response to hammer and train excitation. These methods are applied at different stages of the track construction. Before track construction, wave velocities and transfer functions of the sub-soil can indicate problems with soft soils. After track construction, a check of the acceptable state of the track can be done by comparison of many excitation positions and track sites. After a track damage (a lose sleeper or a lose plate of a slab track) and after its repair, the sensitivity of the different measurement quantities to different track errors and the achieved improvement of the repair can be determined. The contribution shows examples of all these track situations T2 - Int. Conf. on Rail Transportation CY - Chengdu, China DA - 10.07.2017 KW - Track damage KW - Dynamic testing KW - Hammer tests KW - Train passages PY - 2017 AN - OPUS4-42490 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER -