TY - CONF A1 - Heckel, Thomas A1 - Wack, Y. A1 - Mook, G. T1 - Simulation of an instrumented ultrasonic test run with a rail inspection train N2 - Rail inspection performed by ultrasonic rail inspection trains is a complex and challenging process. A large number of variables and parameters given by the environment, the track and the testing-system have an influence on the overall performance of the inspection and the inspection result. Typically the parameter vary in a combination depending on the track condition. To evaluate the individual influence of each relevant variable, simulation tools can be used. Therefore the entire inspection process has to be transferred into a model using combined modelling techniques. The goal of this work is to model an instrumented ultrasonic test run with a rail inspection train with the parameters varied by a script over a virtually driven distance. T2 - 46th Annual Review of Progress in Quantitative Nondestructive Evaluation- QNDE 2019 CY - Portland, OR, USA DA - 14.07.2019 KW - Ultrasound KW - Rail inspection KW - Modelling KW - Simulation PY - 2019 VL - 2019 SP - 1 EP - 3 AN - OPUS4-49839 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER -