TY - CONF A1 - Denkler, Tilman T1 - Status of task 8.5 - quality assurance N2 - The presentation was given at the virtual general meeting of the Horizon 2020 project "Metabuilding Labs" to inform the partners about the status of the development of the quality management documentation of MBLabs. T2 - Metabuilding Labs General Meeting March 8th & 9th CY - Online meeting DA - 8.3.2023 KW - Quality Management KW - Metabuilding Labs PY - 2023 AN - OPUS4-57122 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER -