TY - CONF A1 - Gesell, Stephan T1 - WP8 - RCS standardisation work N2 - The presentation presents a first work premise for the acceptable failrate of a hydrogen pressure vessel. Based on this premise, the basic algorithm for the analysis of given acceptance criteria is presented. T2 - TAHYA PSB Meeting#1 CY - TU Chemnitz, Germany DA - 20.11.2018 KW - FCH JU KW - TAHYA KW - Horizon 2020 KW - Safety assessment PY - 2018 AN - OPUS4-47178 LA - eng AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany ER -