TY - GEN A1 - Helmerich, Rosemarie T1 - Long-Term measurement of vertical displacements at the outer concrete bridges of the Berlin Main Station N2 - The Berlin Main Station was built between 2000 and 2006. At the occasion of the 10th anniversary after the Berlin Main Station was officially opened to train traffic, a view back on eight years of monitoring was given. For the period of the construction with different load cases, the monitoring system was required by the Railway Authorities (Eisenbahnbundesam, EBA) to survey differential vertical displacements between neighbouring supports of the glas roof and the partially prestressed middle bridges. 128 sensors were installed.The data was published in the Internet with access restricted to the BAM scientists and the owner of the station, the German Railways DB AG. T2 - 33rd Danubia- Adria Symposium on Advances in Experimental Mechanics CY - Portorož, Slovenia DA - 20.09.2016 KW - Strain measurements KW - Monitoring KW - Differential displacements KW - Berlin Main Station KW - Hydraulic levelling system KW - Laser-based displacement measuring system PY - 2016 UR - https://opus4.kobv.de/opus4-bam/frontdoor/index/index/docId/37540 AN - OPUS4-37540 AD - Bundesanstalt fuer Materialforschung und -pruefung (BAM), Berlin, Germany