TY - GEN A1 - Krautz, Hans Joachim A1 - Nimtz, Michael T1 - Flexible Operation of CCS Power Plants to Match Variable Renewable Energies T2 - Energy Procedia N2 - The German Energiewende is resulting in high grid load changes caused by renewable energies. Therefore flexibility of power plants is getting more and more important. Future CCS power plants are usually equipped with more components than conventional power plants, resulting in a more complex and inert reaction on changes in power output. Additionally, due to the change in price structures and higher fixed and operational costs for CCS power plants, it is harder for them to be economically efficient. This study will show different options to increase the flexibility of CCS power plants and evaluate their benefits. KW - CCS; Flexibility; Post combustion capture; Oxyfuel; Solvent storage; Pipeline Y1 - 2013 UR - https://opus4.kobv.de/opus4-UBICO/frontdoor/index/index/docId/9492 SN - 1876-6102 VL - 2013 IS - 40 SP - 294 EP - 303 ER -