Refine
Document Type
- Article (3) (remove)
Language
- English (3)
Has Fulltext
- no (3)
Is part of the Bibliography
- no (3)
Institute
- Network Optimization (3) (remove)
The Fairness-Oriented Crew Rostering Problem (FCRP) considers the joint optimization of attractiveness and fairness in cyclic crew rostering. Like many problems in scheduling and logistics, the combinatorial complexity of cyclic rostering causes exact methods to fail for large-scale practical instances. In case of the FCRP, this is accentuated by the additionally imposed fairness requirements. Hence, heuristic methods are necessary. We present a three-phase heuristic for the FCRP combining column generation techniques with variable-depth neighborhood search. The heuristic exploits different mathematical formulations to find feasible solutions and to search for improvements. We apply our methodology to practical instances from Netherlands Railways (NS), the main passenger railway operator in the Netherlands Our results show the three-phase heuristic finds good solutions for most instances and outperforms a state-of-the-art commercial solver.
We present an optimization model which is capable of routing and ordering trains on a microscopic level under a moving block regime. Based on a general timetabling definition (GTTP) that allows the plug in of arbitrarily detailed methods to compute running and headway times, we describe a layered graph approach using velocity expansion, and develop a mixed integer linear programming formulation. Finally, we present promising results for a German corridor scenario with mixed traffic, indicating that applying branch-and-cut to our model is able to solve reasonably sized instances with up to hundred trains to optimality.
Urban transportation systems are subject to a high level of variation and fluctuation in demand over the day. When this variation and fluctuation are observed in both time and space, it is crucial to develop line plans that are responsive to demand. A multi-period line planning approach that considers a changing demand during the planning horizon is proposed. If such systems are also subject to limitations of resources, a dynamic transfer of resources from one line to another throughout the planning horizon should also be considered. A mathematical modelling framework is developed to solve the line planning problem with a cost-oriented approach considering transfer of resources during a finite length planning horizon of multiple periods. We use real-life public transportation network data for our computational results. We analyze whether or not multi-period solutions outperform single period solutions in terms of feasibility and relevant costs. The importance of demand variation on multi-period solutions is investigated. We evaluate the impact of resource transfer constraints on the effectiveness of solutions. We also study the effect of period lengths along with the problem parameters that are significant for and sensitive to the optimality of solutions.