Refine
Year of publication
Document Type
- ZIB-Report (14) (remove)
Has Fulltext
- yes (14)
Is part of the Bibliography
- no (14)
Keywords
- duty scheduling (3)
- column generation (2)
- duty templates (2)
- integrated scheduling (2)
- rapid branching (2)
- Airline Crew Scheduling (1)
- Benders decomposition (1)
- Benders' decomposition (1)
- Branch and Generate (1)
- Bundle Method (1)
Institute
This article proposes a Lagrangean relaxation approach to solve integrated duty and vehicle scheduling problems arising in public transport. The approach is based on the proximal bundle method for the solution of concave decomposable functions, which is adapted for the approximate evaluation of the vehicle and duty scheduling components. The primal and dual information generated by the bundle method is used to guide a branch-and-bound type algorithm. Computational results for large-scale real-world integrated vehicle and duty scheduling problems with up to 1,500 timetabled trips are reported. Compared with the results of a classical sequential approach and with reference solutions, integrated scheduling offers remarkable potentials in savings and drivers' satisfaction.
The airline crew scheduling problem deals with the construction of crew rotations in order to cover the flights of a given schedule at minimum cost. The problem involves complex rules for the legality and costs of individual pairings and base constraints for the availability of crews at home bases. A typical instance considers a planning horizon of one month and several thousand flights. We propose a column generation approach for solving airline crew scheduling problems that is based on a set partitioning model. We discuss algorithmic aspects such as the use of bundle techniques for the fast, approximate solution of linear programs, a pairing generator that combines Lagrangean shortest path and callback techniques, and a novel rapid branching'' IP heuristic. Computational results for a number of industrial instances are reported. Our approach has been implemented within the commercial crew scheduling system NetLine/Crew of Lufthansa Systems Berlin GmbH.
We propose a model for the integrated optimization of vehicle
rotations and vehicle compositions in long distance railway passenger
transport. The main contribution of the paper is a hypergraph model
that is able to handle the challenging technical requirements as
well as very general stipulations with respect to the ``regularity''
of a schedule. The hypergraph model directly generalizes network
flow models, replacing arcs with hyperarcs. Although NP-hard in
general, the model is computationally well-behaved in practice. High
quality solutions can be produced in reasonable time using high
performance Integer Programming techniques, in particular, column
generation and rapid branching. We show that, in this way,
large-scale real world instances of our cooperation partner DB
Fernverkehr can be solved.
Duty rostering problems occur in different application contexts and come in different flavors. They give rise to very large scale integer programs which ypically have lots of solutions and extremely fractional LP relaxations. In such a situation, heuristics
can be a viable algorithmic choice. We propose an mprovement method of the Lin-Kernighan type for the solution of duty rostering problems. We illustrate its versatility and solution quality on three different applications in public transit, vehicle routing, and
airline rostering with a focus on the management of preferences, fairness, and fatigue, respectively.
Duty Scheduling Templates
(2012)
We propose duty templates as a novel concept to produce similar duty
schedules for similar days of operation in public transit. Duty templates
can conveniently handle various types of similarity requirements, and
they can be implemented with ease using standard algorithmic techniques.
They have produced good results in practice.
This paper provides a highly integrated solution approach for rolling stock
planning problems in the context of intercity passenger traffic. The main
contributions are a generic hypergraph based mixed integer programming
model and an integrated algorithm for the considered rolling stock rotation
planning problem. The new developed approach is able to handle a very large
set of industrial railway requirements, such as vehicle composition,
maintenance constraints, infrastructure capacity, and regularity aspects.
By the integration of this large bundle of technical railway aspects, we show
that our approach has the power to produce implementable rolling stock
rotations for our industrial cooperation partner DB Fernverkehr.
This is the first time that the rolling stock rotations at DB Fernverkehr
could be optimized by an automated system utilizing advanced mathematical
programming techniques.
Integrated treatment of hitherto individual steps in the planning process of public transit companies discloses opportunities to reduce costs and to improve the quality of service. The arising integrated planning problems are complex and their solution requires the development of novel mathematical methods. This article proposes a mathematical optimization approach to integrate duty scheduling and rostering in public transit, which allows to significantly increase driver satisfaction at almost zero cost. This is important in order to to increase the attractiveness of the driver profession. The integration is based on coupling the subproblems by duty templates, which, compared to a coupling by duties, drastically reduces the problem complexity.
Wir beschreiben einen Ansatz zur integrierten Umlauf- und Dienstplanung im öffentlichen Nahverkehr. Der Ansatz zielt auf die Verbesserung des Gesamtwirkungsgrades dieser beiden Planungsschritte und auf die besondere Planungsproblematik im Regionalverkehr. Wir entwickeln dazu mathematische Optimierungstechniken für den Einsatz in den Planungssystemen MICROBUS II und DIVA.
The currently most popular approach to handle non-linear battery behavior for electric vehicle scheduling is to use a linear spline interpolation of the charge curve. We show that this can lead to approximate models that underestimate the charge duration and overestimate the state of charge, which is not desirable. While the error is of second order with respect to the interpolation step size, the associated mixed-integer linear programs do not scale well with the number of spline segments. It is therefore recommendable to use coarse interpolation grids adapted to the curvature of the charge curve, and to include sufficient safety margins to ensure solutions of approximate models remain feasible subjected to the exact charge curve.