Refine
Document Type
- ZIB-Report (13)
- In Proceedings (7)
- Article (5)
- Book chapter (1)
Language
- English (26) (remove)
Is part of the Bibliography
- no (26)
Keywords
- Periodic timetabling (5)
- Passenger routing (3)
- Public transport (3)
- combinatorial optimization (3)
- line planning (3)
- direct connection (2)
- integer programming (2)
- metric inequalities (2)
- transfers (2)
- Bipartite matching (1)
Institute
The Cycle Embedding Problem
(2014)
Given two hypergraphs, representing a fine and a coarse "layer", and a cycle cover of the nodes of the coarse layer, the cycle embedding problem (CEP) asks for an embedding of the coarse cycles into the fine layer. The CEP is NP-hard for general hypergraphs, but it can be solved in polynomial time for graphs. We propose an integer rogramming formulation for the CEP that provides a complete escription of the CEP polytope for the graphical case. The CEP comes up in railway vehicle rotation scheduling. We present computational results for problem instances of DB Fernverkehr AG that justify a sequential coarse-first-fine-second planning approach.
The Cycle Embedding Problem
(2016)
Given two hypergraphs, representing a fine and a coarse "layer", and a cycle cover of the nodes of the coarse layer, the cycle embedding problem (CEP) asks for an embedding of the coarse cycles into the fine layer. The CEP is NP-hard for general hypergraphs, but it can be solved in polynomial time for graphs. We propose an integer rogramming formulation for the CEP that provides a complete escription of the CEP polytope for the graphical case. The CEP comes up in railway vehicle rotation scheduling. We present computational results for problem instances of DB Fernverkehr AG that justify a sequential coarse-first-fine-second planning approach.
A Simple Way to Compute the Number of Vehicles That Are Required to Operate a Periodic Timetable
(2018)
We consider the following planning problem in public transportation: Given a periodic timetable, how many vehicles are required to operate it? In [9], for this sequential approach, it is proposed to first expand the periodic timetable over time, and then answer the above question by solving a flow-based aperiodic optimization problem. In this contribution we propose to keep the compact periodic representation of the timetable and simply solve a particular perfect matching problem. For practical networks, it is very much likely that the matching problem decomposes into several connected components. Our key observation is that there is no need to change any turnaround decision for the vehicles of a line during the day, as long as the timetable stays exactly the same.
A Simple Way to Compute the Number of Vehicles That Are Required to Operate a Periodic Timetable
(2018)
We consider the following planning problem in public transportation: Given a
periodic timetable, how many vehicles are required to operate it?
In [9], for this sequential approach, it is proposed to first expand the periodic
timetable over time, and then answer the above question by solving a flow-based
aperiodic optimization problem.
In this contribution we propose to keep the compact periodic representation of
the timetable and simply solve a particular perfect matching problem. For practical
networks, it is very much likely that the matching problem decomposes into several
connected components. Our key observation is that there is no need to change any
turnaround decision for the vehicles of a line during the day, as long as the timetable
stays exactly the same.
The treatment of transfers is a major challenge in line planning. Existing models either route passengers and lines sequentially, and hence disregard essential degrees of freedom, or they are of
extremely large scale, and seem to be computationally intractable. We propose a novel direct connection approach that allows an integrated optimization of line and passenger routing, including accurate estimates of the number of direct travelers, for large-scale real-world instances.
We consider multi-commodity flow problems in which capacities are installed on paths. In this setting, it is often important to distinguish between flows on direct connection routes, using single paths, and flows that include path switching. We derive a feasibility condition for path capacities supporting such direct connection flows similar to the well-known feasibility condition for arc capacities in ordinary multi-commodity flows. The condition can be expressed in terms of a class of metric inequalities for routings on direct connections. We illustrate the concept on the example of the line planning problem in public transport and present an application to large-scale real-world problems.