TY - GEN A1 - Borndörfer, Ralf A1 - Löbel, Andreas A1 - Weider, Steffen T1 - A Bundle Method for Integrated Multi-Depot Vehicle and Duty Scheduling in Public Transit N2 - This article proposes a Lagrangean relaxation approach to solve integrated duty and vehicle scheduling problems arising in public transport. The approach is based on the proximal bundle method for the solution of concave decomposable functions, which is adapted for the approximate evaluation of the vehicle and duty scheduling components. The primal and dual information generated by the bundle method is used to guide a branch-and-bound type algorithm. Computational results for large-scale real-world integrated vehicle and duty scheduling problems with up to 1,500 timetabled trips are reported. Compared with the results of a classical sequential approach and with reference solutions, integrated scheduling offers remarkable potentials in savings and drivers' satisfaction. T3 - ZIB-Report - 04-14 KW - vehicle scheduling KW - crew scheduling KW - integrated scheduling KW - public transit KW - bundle method Y1 - 2004 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-7898 ER - TY - GEN A1 - Borndörfer, Ralf A1 - Dittbrenner, Bastian A1 - Langenhan, Andreas A1 - Seidl, Stephan A1 - Weider, Steffen T1 - Integrierte Dienst- und Dienstreihenfolgeplanung zur Erhöhung der Fahrerzufriedenheit N2 - Wir stellen einen mathematischen Optimierungsansatz zur integrierten Dienst- und Dienstreihenfolgeplanung im öffentlichen Nahverkehr vor, mit dem sich bei konstanten Personalkosten die Fahrerzufriedenheit deutlich steigern lässt. T3 - ZIB-Report - 14-02 KW - duty scheduling KW - duty rostering KW - integrated scheduling KW - Benders' decomposition Y1 - 2014 U6 - http://nbn-resolving.de/urn/resolver.pl?urn:nbn:de:0297-zib-50270 SN - 1438-0064 ER -