Planning the construction of new transport routes or power lines on terrain is usually carried out manually by engineers, with no guarantee of optimality. We introduce a new approach for the computation of an optimal trajectory for the construction of new transit routes and power lines between two locations on a submanifold U _ R3 representing the topography of a terrain. U is approximatively modeled by a special weighted grid. On this grid, the shortest paths for the construction of new routes are determined, whereby we consider three optimization criteria: routes with minimum distance, routes with lowest construction costs and routes with minimum absolute altitude variations or minimum absolute gradients. Subsequently, a combination of these criteria is used to expand this problem into a multi-criteria optimization problem. A shortest path algorithm, such as the Dijkstra algorithm, is used to compute optimal compromises for the construction of new routes.
The multiple traveling salesmen problem with moving targets is a generalization of the classical traveling salesmen problem, where the targets (cities or objects) are moving over time. Additionally, for each target a visibility time window is given. The task is to find routes for several salesmen so that each target is reached exactly once within its visibility time window and the sum of all traveled distances of all salesmen is minimal. We present different modeling formulations for this TSP variant. The time requirements are modeled differently in each approach. Our goal is to examine what formulation is most suitable in terms of runtime to solve the multiple traveling salesmen problem with moving targets with exact methods. Computational experiments are carried out on randomly generated test instances to compare the different modeling approaches. The results for large-scale instances show, that the best way to model time requirements is to directly insert them into a formulation with discrete time steps.
We consider the problem of planning an inspection flight to a given set of waypo- ints using an inhomogeneous fleet of multirotor, battery-driven micro aerial vehicles (MAVs). Therein, two subproblems must be solved. On the one side, the detailed trajectories of all MAVs must be planned, taking technical and environmental restrictions into account and on the other side, the MAVs must be assigned to the waypoints considering their installed equipment. The goal is to visit all waypoints in minimal time. The strong interaction of the two subproblems makes it necessary to tackle them simultaneously. Several aspects are taken into account to allow realistic solutions. A two-level time grid approach is applied to achieve smooth trajectories, while the flight dynamics of the MAVs are modeled in great detail. Safety distances must be maintained between them and they can recharge at charging stations located within the mission area. There can be polyhedral restricted air spaces that must be avoided. Furthermore, weather conditions are incorporated by polyhedral wind zones affecting the drones and each waypoint has a time window within it must be visited. We formulate this problem as a mixed-integer linear program and show whether the state-of-the-art numerical solver Gurobi is applicable to solve model instances.
We consider the mission and flight planning problem for an inhomogeneous fleet of unmanned aerial vehicles (UAVs). Therein, the mission planning problem of assigning targets to a fleet of UAVs and the flight planning problem of finding optimal flight trajectories between a given set of waypoints are combined into one model and solved simultaneously. Thus, trajectories of an inhomogeneous fleet of UAVs have to be specified such that the sum of waypoint-related scores is maximized, considering technical and environmental constraints. Several aspects of an existing basic model are expanded to achieve a more detailed solution. A two-level time grid approach is presented to smooth the computed trajectories. The three-dimensional mission area can contain convex-shaped restricted airspaces and convex subareas where wind affects the flight trajectories. Furthermore, the flight dynamics are related to the mass change, due to fuel consumption, and the operating range of every UAV is altitude-dependent. A class of benchmark instances for collision avoidance is adapted and expanded to fit our model and we prove an upper bound on its objective value. Finally, the presented features and results are tested and discussed on several test instances using GUROBI as a state-of-the-art numerical solver.
In wire-arc additive manufacturing, a wire is molten by an electrical or laser arc and deposited droplet-by-droplet to construct the desired workpiece, given as a set of two-dimensional layers. The weld source can move freely over a substrate plate, processing each layer, but there is also the possibility of moving without welding. A primary reason for stress inside the material is the large thermal gradient caused by the weld source, resulting in lower product quality. Thus, it is desirable to control the temperature of the workpiece during the process. One way of its optimization is the trajectory of the weld source. We consider the problem of finding a trajectory of the moving weld source for a single layer of an arbitrary workpiece that maximizes the quality of the part and derive a novel mixed-integer PDE-constrained model, including the calculation of a detailed temperature distribution measuring the overall quality. The resulting optimization problem is linearized and solved using the state-of-the-art numerical solver IBM CPLEX. Its performance is examined by several computational studies.
In wire-arc additive manufacturing (WAAM), the desired workpiece is built layerwise by a moving heat source depositing droplets of molten wire on a substrate plate. To reduce material accumulations, the trajectory of the weld source should be continuous, but transit moves without welding, called deadheading, are possible. The enormous heat of the weld source causes large temperature gradients, leading to a strain distribution in the welded material which can lead even to cracks. In summary, it can be concluded that the temperature gradient reduce the quality of the workpiece. We consider the problem of finding a trajectory of the weld source with minimal temperature deviation from a given target temperature for one layer of a workpiece with welding segments broader than the width of the weld pool. The temperature distribution is modeled using the finite element method. We formulate this problem as a mixed-integer linear programming model and demonstrate its solvability by a standard mixed-integer solver.
We address the single container packing problem of a company that has to serve its customers by first placing the products in boxes and then loading the boxes into a container. We approach the problem by developing and solving mixed-integer linear models. Our models consider geometric constraints that feature non-overlapping constraints, box orientation constraints, dimensionality constraints, relative packing position constraints, and linearity constraints. We also develop an extension of the models by integrating load balance and the deviation of the center of gravity. We tested the models on a broad set of real instances involving up to 41 boxes and obtained optimal solutions in most cases and very small gaps when optimality could not be proven.
The German Armed Forces provide an operation contingent to support the North Atlantic Treaty Organization (NATO) Response Force (NRF). For this purpose, a „warehouse” containing accommodations, food supplies, medical supplies, and spare parts for the systems has to be available. Such a warehouse is restricted in weight, in order to be quickly movable in an upcoming deployment situation. It should be able to supply the NRF troops for a certain amount of time (e.g., one month) without re-supply from the outside. To ensure optimal use of such a restricted warehouse, we developed the computer program „The OPtimization of a Spare Parts Inventory” (TOPSPIN) to find an optimal mix of spare parts to restore a set of systems to functionality. Each system is composed of several parts, and it can only be used again in the mission if all broken parts are replaced. The failure rate of the individual parts follows a given random distribution, and during deployment it is expected to be higher than in the homeland. Due to the stochastic nature of the problem, we generate scenarios that simulate the actual failure of the parts. The backbone of TOPSPIN is a mixed-integer linear program that determines an optimal, scenario-robust mix of spare parts and is solved using standard state-of-the-art numerical solvers. Using input data provided by the Logistikzentrum, we analyze how many scenarios need to be generated in order to determine reliable solutions. Moreover, we analyze the composition of the warehouse over a variety of different weight restrictions, and we calculate the number of repairable systems as a function of this bound.
In recent years parcel volumes reached record highs. The logistics industry is seeking new innovative concepts to keep pace. For densely populated areas delivery robots are a promising alternative to conventional trucking. These electric robots drive autonomously on sidewalks and deliver urgent goods, such as express parcels, medicine, or meals. The limited cargo space and battery capacity of these vehicles necessitates a depot visit after each customer served. The problem can be formulated as an electric vehicle routing problem with soft time windows and a single unit capacity. The goal is to serve all customers such that the quadratic sum of delays is minimized and each vehicle operates within its battery bounds. To solve this problem, we formulate an MIQP and present an expanded formulation based on a layered graph. For this layered graph we derive two solution approaches based on relaxations, which use less nodes and arcs. The first, Iterative Refinement, always solves the current relaxation to optimality and refines the graph if the solution is not feasible for the expanded formulation. This is repeated until a proven optimal solution is found. The second, Branch and Refine, integrates the graph refinement into a branch and bound framework avoiding restarts. Computational experiments performed on modified Solomon instances demonstrate the advantage of using our solution approaches and show that Branch and Refine outperforms Iterative Refinement in all studied parameter configurations.
We present a general numerical solution method for control problems with PDE-defined state variables over a finite set of binary or continuous control variables. We show empirically that a naive approach that applies a numerical discretization scheme to the PDEs (and if necessary a linearization scheme) to derive constraints for a mixed-integer linear program (MILP) leads to systems that are too large to be solved with state-of-the-art solvers for MILPs, especially if we desire an accurate approximation of the state variables. Our framework comprises two techniques to mitigate the rise of computation times with increasing discretization level parameters:
First, the linear system is solved for a basis of the control space in a preprocessing step. Second, certain constraints are just imposed on demand via the IBM ILOG CPLEX feature of a lazy constraint callback. These techniques are compared with an approach where the relations obtained by the discretization of the continuous constraints are directly included in the MILP. We demonstrate our approach on two examples: modeling of the spread of wildfire and the mitigation of water contamination. In both examples the computational results demonstrate that the solution time is significantly reduced by our methods. In particular, the dependence of the computation time on the size of the spatial discretization of the PDE is significantly reduced.